Sunday, 20 March 2011

Log chest and table installed!

Elaine & I travelled down to the boat in good time; arriving circa 11.00am. The previous evening I had collected the new log box and table from the joiners shop made to my design and sizes. It was quite a relief when the log box actually fit snugly into the bow deck. We then spent the remainder of the afternoon fitting the table leg base and pole into the steel deck. Although the steel was 5mm thick it was cut through quite quickly with my steel hole cutter. I'm thinking - money well spent on the hole cutter!
Anyway by 4.30pm all was installed and the front deck was looking quite a good place to hangout on the boat. I am typing this update from the new facility! The seat is a little hard; as I still need to make a template to take to the upholsterers to have a loose seat cushion made.
New Log Chest/Seat and Table Installed.

No comments:

Post a Comment